Cracks after your neighbour's building work

Fine cracks in plaster are common next to building work, especially along the party wall and around ceilings. Most are cosmetic and easily put right. What matters is recording them promptly so they can be dealt with under the award.

Common types

What you see Often caused by
Hairline cracks along the party wall or ceiling Vibration from cutting or drilling
Cracks around door frames Slight movement as loads change
Diagonal cracks that widen towards the top Movement in the foundations, which needs prompt inspection
Stepped cracks in outside brickwork Movement a surveyor should look at

What to do

  1. Photograph each crack with the date and something for scale, such as a coin.
  2. Write down the date you spotted it and what was happening next door at the time.
  3. Report it in writing to the surveyor and the builder.
  4. Check it from time to time to see whether it is growing.

How it is assessed

The surveyor compares the crack with the schedule of condition. New cracks near the work point to the work, especially if the timing fits. Existing cracks that have widened can count as damage too.

How it is put right

Usually by filling and redecorating, done either by the building owner's contractor or through a payment so you can arrange it yourself. See repair or payment.

Common questions

Should I wait until the work is finished before reporting cracks?

No. Report them as you notice them, so the surveyor can check whether anything needs to change on site.

Where this comes from in the Act

Links go to the official text of the Party Wall etc. Act 1996 on legislation.gov.uk.

Has a notice landed on your doormat?

Ivan Larkin can read it through with you, explain your choices and act as your surveyor. In most cases the owner doing the work pays for that.

Call 07477 207993Send an enquiry